STEP3 Inspection and commissioning

Inspection and field tests by a specialist in quality assurance, trial operation, adjustment, and handover.

  1. Final acceptance test by a specialist.
  2. Adjustment of the dust collection system to suit the user's plant by trial operation and adjustment.
  3. Collection efficiency test performed by third-party environmental measurer and report of measurement results.
  4. Provision of detailed operating guidance to the user's operating personnel by means of an operation briefing and direct guidance on equipment operation.

Operating guidance briefing

Provision of detailed operating guidance to the user's operating personnel.

Field tests and adjustment

(L) Adjustment of high-voltage power supply control panel
(R) Adjustment of ash handling control panel

  • STEP1 Planning

    Proposal of ESP system that meets the user's needs by mobilizing the latest Computer Aided Engineering (CAE) technologies.

  • STEP2 Fabrication and construction

    Manufacture, fabrication and construction ensuring quality and short construction period with foremost priority on safety by mobilizing the latest CAE technologies and manufacturing/construction technical capabilities.

  • STEP3 Inspection and commissioning

    Inspection and field tests by a specialist in quality assurance, trial operation, adjustment, and handover.

  • STEP4 Operation support and maintenance

    Support for operation and maintenance provided with close attention by an assigned specialist.