STEP3 Inspection and commissioning
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im01_0.png?itok=aFRWAjQ7)
Inspection and field tests by a specialist in quality assurance, trial operation, adjustment, and handover.
- Final acceptance test by a specialist.
- Adjustment of the dust collection system to suit the user's plant by trial operation and adjustment.
- Collection efficiency test performed by third-party environmental measurer and report of measurement results.
- Provision of detailed operating guidance to the user's operating personnel by means of an operation briefing and direct guidance on equipment operation.
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im01%20%288%29.jpeg?itok=RE4ZnVWU)
Operating guidance briefing
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im02%20%282%29_0.jpg?itok=fsX68jm_)
Field tests and adjustment
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im03%20%281%29_0.jpg?itok=rYSvSzn8)
(R) Adjustment of ash handling control panel
- STEP1 Planning
Proposal of ESP system that meets the user's needs by mobilizing the latest Computer Aided Engineering (CAE) technologies.
- STEP2 Fabrication and construction
Manufacture, fabrication and construction ensuring quality and short construction period with foremost priority on safety by mobilizing the latest CAE technologies and manufacturing/construction technical capabilities.
- STEP3 Inspection and commissioning
Inspection and field tests by a specialist in quality assurance, trial operation, adjustment, and handover.
- STEP4 Operation support and maintenance
Support for operation and maintenance provided with close attention by an assigned specialist.