STEP2 Fabrication and construction
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im01_0.png?itok=aFRWAjQ7)
Manufacture, fabrication and construction ensuring quality and short construction period with foremost priority on safety by mobilizing the latest CAE technologies and manufacturing/construction technical capabilities.
- By means of advance study using CAE and by determining the optimum dimensions and form for factory manufacture/material handling/construction, improve construction efficiency and reduce construction time.
- Improve manufacturing precision and shorten the manufacturing time by coordinating with NC finishing machines and using working drawings created by a 3D CAD system.
- Select transportation methods and routes that are suited to the construction site and transport materials, parts and equipment according to the construction schedule.
- Perform on-site construction by using technologies such as the module construction method.
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im02_0.jpeg?itok=SfL_DniM)
Study of fabrication and construction
3D-Manufacture and fabrication
Improve manufacturing precision and shorten the manufacturing time by coordinating with NC finishing machines and using working drawings created by a 3D CAD system.
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im03_0.jpg?itok=EXvj2oqQ)
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im04%20%281%29_0.jpg?itok=_XDoz0cj)
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im05%20%281%29_0.jpg?itok=iFzQglmk)
Transportation
Select transportation methods and routes that are suited to the construction site and transport materials, parts and equipment according to the construction schedule.
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im06%20%281%29_0.jpg?itok=4KOw3CqW)
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im07%20%281%29_0.jpg?itok=Uq3uRZDf)
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im08%20%281%29_0.jpg?itok=Bqzu3Xpt)
Construction
Perform on-site construction by the module constructions method.
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im09_0.jpg?itok=NjUknkW_)
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im10_0.jpg?itok=ZdPVvDiZ)
![](/group/es/sites/g/files/jwhtju1306/files/styles/original_image/public/2021-03/index_im11_0.jpg?itok=Q6GE7ov6)
- STEP1 Planning
Proposal of ESP system that meets the user's needs by mobilizing the latest Computer Aided Engineering (CAE) technologies.
- STEP2 Fabrication and construction
Manufacture, fabrication and construction ensuring quality and short construction period with foremost priority on safety by mobilizing the latest CAE technologies and manufacturing/construction technical capabilities.
- STEP3 Inspection and commissioning
Inspection and field tests by a specialist in quality assurance, trial operation, adjustment, and handover.
- STEP4 Operation support and maintenance
Support for operation and maintenance provided with close attention by an assigned specialist.