FT8® MOBILEPAC® Gas Turbine Package
-
Power generation within one day from arrival at the site
(pre-commissioned and site-ready.) -
When soil-bearing capacity is excellent
No foundation required
-
Integrated housing for the GT and generator
No site alignment required
-
Operation at 50 Hz or 60 Hz
Dual Frequency
The FT8®MOBILEPAC® gas turbine package requires a small footprint utilizing an 80 by 54-foot area in parallel configuration. The aero-derivative FT8 MOBILEPAC package design is fast to deliver, install, and produce power, and the ideal solution for peaking or grid-firming applications.
Very little advanced site preparation is required, and no foundation or concrete pad is necessary for installation of the unit. The unit is transportable by land, sea, or air and modularly packaged for quick, worldwide delivery and installation.
- Features
- Arrangements
- Delivery Record
- A new MOBILEPAC® gas turbine package can be assembled and generating power within a few weeks of arrival at a site.
- The standard package can easily be reconfigured to operate at either 50 Hz or 60 Hz.
- The trailers run on public roads for prompt use as an emergency power source.
- The major components are packaged into two trailers to enable complete installation for emergency power generation within one day (pre-commissioned and site-ready units).
- Compact enough for air transport to minimize delivery time (in addition to land and ocean transport).
- The advanced package design eliminates the need for concrete foundations, thereby reducing the cost and time required to complete installation.
Output | 60 Hz/50 Hz:31 MW/29 MW (Dual Frequency) |
---|---|
Fuel | Dual Fuel (Gas/Oil) |
Type of Trailers | Power and Control; in-line or parallel configuration |
Cooling Method | Air Cooling |





Year of launch | 2004 |
---|---|
Number of units delivered | Over 150 Units |
Delivery Results

Algeria 54 units (2013-2015)

Mexico 10 Units (2022-2024)



Solution
In addition to using the MOBILEPAC® unit (movable, dual-frequency power station) as an emergency power source for disasters and big events, we propose that customers make the most of the features of the MOBILEPAC® unit as a temporary power source for operation during the construction of large power plants.
- If surplus power is to be transmitted in addition to the power source for construction work, the MOBILEPAC® unit is very useful in countries with tight electricity supplies.
- The trailers can run on public roads. The MOBILEPAC® unit is easy to disassemble, and can be moved easily to the next construction site and reassembled once a power plant is completed. This portability cuts the cost of using a temporary power supply facility.
- The MOBILEPAC® unit also can provide a power source during periodic inspections.
Output | 60 Hz/50 Hz:31 MW/29 MW(Dual Frequency) |
---|---|
Fuel | Dual Fuel (Gas/Oil) |
Start-up Time | 10 minutes (cold start to full power) |
Type of Trailer | Mobile |
Trailer Installation | Flexible Trailer Siting |
Number of Trailers | 2 |
Cooling Method | Air Cooling |
Type of Generator/ Voltage of SWGR | Open-ventilated Air Cooling/ 15 kV |
NOx Control | Water Injection |
Starting Method | Hydraulic |
Type of Ignition | Electric Spark |
Turning | Unnecessary |
Reduction Gear | Unnecessary |
|
50 Hz |
60 Hz |
|
---|---|---|---|
Compressor |
Axial, multi-stage |
||
Combustor |
Cannular |
||
Turbine |
Axial, multi-stage |
||
Rotor |
Build-up |
||
Output |
Free |
||
Speed |
rpm |
3,000 |
3,600 |
Gas Turbine |
Dimension |
5m×2m×3m |
|
Weight |
13t |
50 Hz |
60 Hz |
||
---|---|---|---|
50 HzISO Base Rating |
kW |
28,528 |
30,941 |
Efficiency |
% |
34.7 |
36.7 |
LHV Heat Rate |
kJ/kWh |
10,376 |
9,825 |
Btu/kWh |
9,834 |
9,312 |
|
Exhaust Flow |
kg/s |
92 |
92 |
Exhaust Temp. |
℃ |
496 |
491 |
F |
924 |
916 |
|
Start-up Time |
Minutes |
10 (cold start to full power) |
10 (cold start to full power) |